While breaking and repairing the surface is one approach to adding pipes, cables and lines below a driveway, sidewalk or other surface, that method comes with extra labor, cost and challenges.
Pipes of 1.2 metres in diameter have to be laid vertically through the top of the tunnel on which work began on Sunday as a second option to reach the stranded labourers Rescue operation underway to ...